As some of you already know, we are moving our website from www.asteamtechnologies.com to www.asteamtechno.com as our new platform with some extra security features, optimized for Mobile view, A strong and visible call to action and many more.... Please update to your database i.e. Email addresses & web address as earliest as possible,
Thank you,
ATSPL team, Surat, India.
We have dedicated team of experts for Testing & Commissioning services of all types of Protection Relays, Control & Relay Panels, Switchgear Panels, Transformers, Motors and Sub-stations up to 220KV.
The testing of protection equipment may be divided into four stages :
- Type tests
- Routine factory production tests
- Commissioning tests
- Periodic maintenance tests
21 - Impedance
24 - Volts/Hz
25 - Synchronizing
27 - Under Voltage
32 - Directional Power Element
46 - Negative Sequence Current
40 - Loss of Excitation
50 - Instantaneous Overcurrent (N for neutral, G for ground current)
51 - Inverse Time Overcurrent (N for neutral, G from ground current)
59 - Over Voltage
62 - Timer
64 - Ground Fault (64F = Field Ground, 64G = Generator Ground)
67 - Directional Over Current (typically controls a 50/51 element
81 - Under/Over Frequency
86 - Lockout Relay / Trip Circuit Supervision
87 - Current Differential (87L=transmission line diff; 87T=transformer diff; 87G=generator diff)
Magnetizing current
Magnetic balance
Vector group
IR/PI
Ratio
Winding resistance
Manual ‘ON’ and ‘OFF’ operation
Contact Resistance
Insulation resistance
Opening time
Closing time
Close to open time( HT Breaker)
Vacuum Bottle Level Check( HV Test)
Insulation Resistance Test
Bus bar Resistance (With Joint)
Bus bar High Voltage
IR/PI test
Withstand test
Tandelta test